Case Studies

 
  • LNG Tanker Gandria engine room floods.  High pressure and low pressure main propulsion turbines are damaged.  ATC provides emergency delivery of complete set of labyrinth packing for both units in record four day shipment to Singapore.
     
  • Chemical plant waited two months for OEM quote for spare parts for planned outage.  When quote finally received from OEM, lead time was 15 weeks – well beyond outage requirements.  ATC quoted customer in two days and was able to provide delivery of parts in three weeks, well ahead of outage schedule.
     
  • Paper plant in Alabama required valve asm to avoid a potential shutdown of boiler feed pump turbine.  OEM had an eight week delivery for required part. ATC was able to locate part and ship in one week – avoiding costly shutdown of turbine.